个人信息 Personal information
出生日期:1974-02-26
学历:研究生毕业
在职信息:在职
所在单位:水利水电学院
入职时间:2009-12-01
- [1]. 夏军强 Modelling flash flood risk in urban areas. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT. 164 (6). 2011.
- [2]. 夏军强 Response of reach-scale bankfull channel geometry to the altered flow and sediment regime in the .... GEOMORPHOLOGY. 213. 2014.
- [3]. 夏军强 Recent variation in reach-scale bankfull discharge in the Lower Yellow River. EARTH SURFACE PROCESSES AND LANDFORMS. 39 (6). 2014.
- [4]. 夏军强 Formula of incipient velocity for flooded vehicles. NATURAL HAZARDS. 58 (1). 2011.
- [5]. 夏军强 Estimation of bankfull discharge in the Lower Yellow River using different approaches. GEOMORPHOLOGY. 117 (1-2). 2010.
- [6]. 夏军强 Comparison of Morphodynamic Models for the Lower Yellow River. JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION. 49 (1). 2013.
- [7]. 夏军强 New criterion for the stability of a human body in floodwaters. JOURNAL OF HYDRAULIC RESEARCH. 52 (1). 2014.
- [8]. 夏军强 Seasonal variations in composite riverbank stability in the Lower Jingjiang Reach, China. JOURNAL OF HYDROLOGY. 519. 2014.
- [9]. 夏军强 Hydrodynamic impact of a tidal barrage in the Severn Estuary, UK. RENEWABLE ENERGY. 35 (7). 2010.
- [10]. 夏军强 Estimation of annual energy output from a tidal barrage using two different methods. APPLIED ENERGY. 93. 2012.
- [11]. 夏军强 DAILY BANK EROSION RATES IN THE LOWER YELLOW RIVER BEFORE AND AFTER DAM CONSTRUCTION. JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION. 50 (5). 2014.
- [12]. 夏军强 Geomorphic response of the Jingjiang Reach to the Three Gorges Project operation. EARTH SURFACE PROCESSES AND LANDFORMS. 42 (6). 2017.
- [13]. 夏军强 Variation in reach-scale bankfull discharge of the Jingjiang Reach undergoing upstream and downst.... JOURNAL OF HYDROLOGY. 547. 2017.
- [14]. 夏军强 Modelling of man-made flood routing in the lower Yellow River, China. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT. 165 (7). 2012.
- [15]. 夏军强 Dynamic channel adjustments in the Jingjiang Reach of the Middle Yangtze River. SCIENTIFIC REPORTS. 6. 2016.
- [16]. 夏军强 Numerical assessment of flood hazard risk to people and vehicles in flash floods. ENVIRONMENTAL MODELLING & SOFTWARE. 26 (8). 2011.
- [17]. 夏军强 Criterion of vehicle stability in floodwaters based on theoretical and experimental studies. NATURAL HAZARDS. 70 (2). 2014.
- [18]. 夏军强 Stability criterion for people in floods for various slopes. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT. 169 (4). 2016.
- [19]. 夏军强 New Criterion of Human Stability in Floodwaters Based on Theoretical and Experimental Studies. PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV. 2013.
- [20]. EFFECTS OF THE THREE GORGES PROJECT OPERATION ON THE VARIATION IN BANKFULL CHANNEL GEOMETRY IN TH.... PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM. 2015.
| |
